• Electric Locomotive
    • 11
    • 12
    • 13
    • 15
    • 16
    • 17
    • 18
    • 18
    • 19
    • 20
    • 21
    • 22
    • 23
    • 25
    • 25.5
    • 26
    • 27
    • 28
    • 28
    • 29
    • 29
  • Diesel Locomotive
    • 51
    • 52
    • 53
    • 54
    • 55
    • 57
    • 59
    • 60
    • 61
    • 62
    • 75
    • 77
  • Shunting Locomotive
    • 70
    • 71
    • 73
    • 74
    • 80
    • 82
    • 83
    • 84
    • 85
    • 91
    • 92
    • 97
  • Electric Multiple Unit
    • AM08
    • AM50
    • AM62
    • AM63
    • AM65
    • AM66
    • AM70
    • AM70A
    • AM73
    • AM74
    • AM75
    • AM78
    • AM79
    • AM80
    • AM86
    • AM96
    • AMCR
    • M7
  • Diesel Multiple Unit
    • 40
    • 41
    • 43
    • 44
    • 45
    • 46
    • 49
    • 551
  • Departmental
    • EM130
    • EM200
    • ES400
    • ES500
    • ES600
    • ES900

    BE: Electric Locomotive: 23

    Electric Loco

    System 3000 V DC
    Length 18.00 m
    Height 3.755 m
    Introduced 1955-1957
    Withdrawn 2012
    Wheel Arrangement Bo-Bo
    Builder BN, ACEC
    Power 1740 kW
    Weight 92 t
    TE 196 kN
    Max Speed 130 km/h
    Driving Wheel Dia 1262 mm
    Width 2.915 m

    2364 + 2365 - Godarville

    Photo: © John Mulrine

    Number Altnumber Status Note Depot Location Base Owner In Service Withdrawn Scrapped
    2301 123.001   X FNND Van Heyghen Recycling, Gent B-B 21/11/1955 09/11/2009 10/2013
    2302 123.002   X Withdrawn after a collision at Antwerpen Noord on 7th August 2005 FNND Antwerpen Noord B-B 26/11/1955 29/09/2005 02/2007
    2303 123.003   X FNND Van Heyghen Recycling, Gent B-B 03/12/1955 15/12/2011 11/2013
    2304 123.004   X FNND Keyser, Courcelles B-B 09/12/1955 10/10/2011 2012
    2305 123.005   X FNND Salzinnes B-B 17/12/1955 05/07/2004 02/2008
    2306 123.006   X FNND Keyser, Courcelles B-B 24/12/1955 15/12/2011 01/2015
    2307 123.007   X FNND Salzinnes B-B 30/12/1955 07/08/1998 01/2003
    2308 123.008   X FNND Van Heyghen Recycling, Gent B-B 05/01/1956 15/12/2011 04/2013
    2309 123.009   P Saint-Ghislain B-PFT 10/01/1956 10/09/2012
    2310 123.010   X FNND Van Heyghen Recycling, Gent B-B 14/01/1956 15/12/2011 12/2012
    2311 123.011   X FNND Van Heyghen Recycling, Gent B-B 18/01/1956 10/09/2012 04/2013
    2312 123.012   X FNND Van Heyghen Recycling, Gent B-B 24/01/1956 15/12/2011 07/2013
    2313 123.013   X FNND B-B 27/01/1956 31/12/2011
    2314 123.014   X FNND B-B 02/02/1956 12/11/2012
    2315 123.015   X FNND B-B 07/02/1956 10/09/2012
    2316 123.016   X FNND B-B 10/02/1956 12/11/2012
    2317 123.017   X FNND B-B 15/02/1956 31/12/2011
    2318 123.018   X FNND B-B 22/02/1956 15/12/2011
    2319 123.019   X FNND B-B 29/02/1956 31/12/2011
    2320 123.020   X FNND B-B 03/03/1956 12/11/2012
    2321 123.021   S FNND B-B 10/03/1956 12/11/2012
    2322 123.022   X FNND B-B 15/03/1956 15/12/2011
    2323 123.023   X FNND B-B 18/03/1956 15/12/2011
    2324 123.024   X FNND B-B 18/03/1956 13/10/2009
    2325 123.025   X FNND B-B 28/03/1956
    2326 123.026   X FNND B-B 04/04/1956 15/12/2011
    2327 123.027   X FNND B-B 08/04/1956 09/12/2009
    2328 123.028   X FNND B-B 12/04/1956 12/11/2012
    2329 123.029   X To Poland for scrap Jan 2021 FNND B-B 18/04/1956 10/10/2011
    2330 123.030   X FNND B-B 27/04/1956 15/12/2011
    2331 123.031   X FNND B-B 27/04/1956 31/12/2011
    2332 123.032   X FNND B-B 04/05/1956 15/12/2011
    2333 123.033   X FNND B-B 12/05/1956 31/12/2011
    2334 123.034   X FNND B-B 16/05/1956 10/09/2012
    2335 123.035   X FNND B-B 20/05/1956 15/12/2011
    2336 123.036   X FNND B-B 27/05/1956 31/12/2011
    2337 123.037   X FNND B-B 01/06/1956 31/12/2011
    2338 123.038   X FNND B-B 06/06/1956 15/12/2011
    2339 123.039   X FNND B-B 06/06/1956 12/11/2012
    2340 123.040   X FNND B-B 14/06/1956 12/11/2012
    2341 123.041   X FNND B-B 20/06/1956 12/11/2012
    2342 123.042   X FNND B-B 23/06/1956 12/11/2012
    2343 123.043   X FNND B-B 28/06/1956 12/11/2012
    2344 123.044   X FNND B-B 04/07/1956 31/10/2011
    2345 123.045   X FNND B-B 07/07/1956 15/12/2011
    2346 123.046   X FNND B-B 12/07/1956 31/12/2011
    2347 123.047   X FNND B-B 02/08/1956
    2348 123.048   X FNND B-B 05/05/1956 31/12/2011
    2349 123.049   X FNND B-B 11/08/1956 12/11/2012
    2350 123.050   X FNND B-B 15/08/1956 15/12/2011
    2351 123.051   X FNND B-B 22/08/1956 12/11/2012
    2352 123.052   X FNND B-B 25/08/1956 29/03/2011
    2353 123.053   X FNND B-B 30/08/1956 15/12/2011
    2354 123.054   X FNND B-B 05/09/1956 07/06/2010
    2355 123.055   X FNND B-B 08/09/1956 12/11/2012
    2356 123.056   X FNND B-B 13/09/1956 31/12/2011
    2357 123.057   X FNND B-B 20/09/1956 12/11/2012
    2358 123.058   X FNND B-B 25/09/1956 15/04/2010
    2359 123.059   X FNND B-B 29/09/1956 15/12/2011
    2360 123.060   X FNND B-B 05/10/1956 12/11/2012
    2361 123.061   X FNND B-B
    2362 123.062   X FNND B-B
    2363 123.063   X FNND B-B
    2364 123.064   X FNND B-B
    2365 123.065   X FNND B-B
    2366 123.066   X FNND B-B
    2367 123.067   X FNND B-B
    2368 123.068   X FNND B-B
    2369 123.069   X FNND B-B
    2370 123.070   X FNND B-B
    2371 123.071   X FNND B-B
    2372 123.072   X FNND B-B
    2373 123.073   X FNND B-B
    2374 123.074   X FNND B-B
    2375 123.075   X FNND B-B
    2376 123.076   X FNND B-B
    2377 123.077   X FNND B-B
    2378 123.078   X FNND B-B
    2379 123.079   X FNND B-B
    2380 123.080   X FNND B-B
    2381 123.081   X FNND B-B
    2382 123.082   X FNND B-B
    2383 123.083   P Steenbrugge B-B