23 units ordered
16 for the Kamptalbahn and 7 for the Erlauftalbahn
Planned to enter operation in 2027 and 2028
Bi-mode Unit
FLIRT Akku
23 units ordered
16 for the Kamptalbahn and 7 for the Erlauftalbahn
Planned to enter operation in 2027 and 2028
| Builder | Stadler Rail |
| Length | 63.20 m |
| Width | 2.82 m |
| Height | 4.25 m |
| Wheel Arrangement | Bo’2’2’Bo’ |
| Power | 1600 kW (Continuous), 2000 kW (Short therm) |
| TE | 140 kN |
| Max Speed | 160 km/h |
| Driving Wheel Dia | 870 mm |
| Seats | 150 seats + 12 folding seats + 228 stading |
| System | 15 kV 16.7 Hz AC, 25 kV 50 Hz AC |
| Number | Alt number | Name | Status | Pool | Depot | Note |
|---|---|---|---|---|---|---|
| 4750 001 | T |