• Tube Stock
    • 1962
    • 1972
    • 1973
    • 1992
    • 1995
    • 1996
    • 2009
    • 2024
  • Sub-Surface Stock
    • C69/77
    • D78
    • S7
    • S8
  • Docklands Light Railway
    • B07
    • B09
    • B23
    • B2K
    • B90
    • B92
  • Overground
    • 172
    • 315
    • 317
    • 345
    • 360
    • 378
    • 710
  • Electric Locomotives
    • Metropolitan-Vickers
  • Departmental
    • Asset Inspection Train
    • BREL Battery Locos
    • Clayton Battery Locomotives
    • Cranes
    • Met-Cam Battery Locomotives
    • Sandite Unit
    • Tampers
    • Track Recording Unit
    • Tunnel Cleaning Train

    TFL: Docklands Light Railway: B23

    New 5 car units, ordered 2017 from CAF, first delivery January 2023.

     

    Builder CAF
    Length 86.7m
    Max Speed 80km/h
    Formation Mc-T-S-T-Mc
    Submit Photo

    Your photo will be submitted to the editors for approval.

    • You must ensure you have permission of the copyright owner to submit this photo for SpotLog
    • Please do not submit photo's taken from Wikipedia or another website unless you have explicit permisson to do so
    • Putting a date in the photo caption is often helpful
    • Upload must be in JPEG format
    Number Alt number Name Status Pool Depot Note
    201 T
    202
    203 T
    204 T
    205
    206
    207
    208
    209 A
    210
    211 A
    212
    213
    214
    215
    216
    217
    218
    219
    220
    221
    222
    223
    224 A
    225
    226
    227
    228
    229
    230
    231
    232
    233
    234
    235
    236
    237
    238 T
    239
    240
    241
    242
    243
    244
    245
    246
    247
    248
    249
    250
    251
    252
    253
    254