- ABe 4/12
- ABe 4/8
- ABe 4/8
- Be 4/4
- Be 4/4
- De 4/4
- ABe 4/8
- BDe 4/4
- BDe 8/8
- Tm 2/2
- Be 6/8 Rubin
- Ae 477
- Em 4/4
- Tm 235
- Bhe 1/2
- Bhe 2/2
- Ohe 1/2
- Xhe 2/2
- Xhm 1/2
- Rem 476
- BDhe 2/3
- BDhe 2/4
- BDhe 2/4
- BDhe 4/4
- Bhe 2/4
- Bhe 4/4
- Bhe 4/6
- Bt
- Bt
- CFhe 2/4
- H 2/2
- H 2/3
- He 2/2
- He 2/3
- Ta 2/2
- E 3/3
- Em 2/2
- TM II
- TM III
- TM IV
- Be 4/4
- Be 552
- RE 450
- Re 456
- Tm
- Tm 1
- Re 430
ZH: RB: Bhe 2/4
| System | 1500 V |
| Length | 15400 mm |
| Introduced | 1937 - 1953 |
| Wheel Arrangement | 2'2'zz |
| Builder | SLM |
| Weight | 16.7 t |
| Max Speed | 18 km / h (uphill) 12 km / h (downhill) |
| Rack | Riggenbach |
Photo: ©Keith47424
| Number | Alt number | Name | Status | Pool | Depot | Note |
|---|---|---|---|---|---|---|
| 1 | A | |||||
| 2 | A | |||||
| 3 | A | |||||
| 4 | A |
Add Link
Select Set:
Select Class: