Double-tracked loop people mover that connects a parking space in the outskirts (Pian di Massiano station) with the city center of Perugia (Pincetto station). Along the line are 5 intermediate station among which an interchange with the rail network (Fontivegge station). A maximum of 25 cars can be in operation simultaneously.
- Line length: 3027m
- Elevation gain: 161m
- Maximum gradient: 11,5%