20 two-way vehicles and 7 one-way Tramlink vehicles will replace the 12 Vevey and 9 RBS trams that will reach the end of their service life between 2023 and 2025. In addition, the trams for the extension of line 9 to Kleinwabern and a frequency increase of line 9 will also be procured in this tranche. The contract includes options for up to a total of 50 trams. A first test will take place in from February 2023. The vehicle will be put into service in stages from summer 2023.
901-907 Single cab (Due to be late delivery in late 2025 early 2026 after storms in Spain closed down the factory for sometime)
911 onwards two cabs.